Planning and performance

Packaging line site-readiness checklist

Prepare space, access, utilities, safety, materials, people and production cover before packaging machinery arrives.

Updated for current UK production and machinery buying guidance on 25 August 2026.

Production environment relating to packaging line site-readiness checklist

Direct answer

A site is ready when the machine can be delivered, positioned, connected, guarded, tested and operated without waiting for unresolved building work, utilities, materials, approvals or people. Complete the readiness review before dispatch and close critical actions before installation begins.

Key takeaways

  • Define the installed and accepted production state.
  • Survey the real route, space and services.
  • Sequence enabling work before machinery delivery.
  • Use a readiness gate and signed action list.

Set a measurable objective

Site readiness should be tied to the installation plan and site acceptance test. State the required start date, planned downtime, production cover and which operations must be available for testing.

  • Set installation, commissioning and production-release dates
  • Identify work that can occur only during shutdown
  • Confirm product and packaging quantities for testing
  • Name site, supplier and contractor owners

Measure the current production condition

Use measured dimensions rather than drawings alone. Check external access, doors, corridors, lifts, floor capacity, ceiling restrictions, drains, ventilation, power, compressed air, network and safe working space.

  • Measure unloading and movement routes
  • Mark final machine, conveyor and guard positions
  • Verify voltage, load, air quality and pressure
  • Confirm extraction, water, drainage and environmental requirements

Plan the work in a controlled sequence

Building, electrical, mechanical and IT work should be completed and tested before the supplier depends on it. Coordinate isolations, permits, lifting, waste removal and access around normal site activity.

  • Issue approved layout and utility schedule
  • Book lifting and positioning equipment
  • Complete services with test certificates
  • Prepare permits, inductions and contractor controls

Hold the improvement after handover

Hold a formal review shortly before dispatch. Critical actions should have evidence and owners; open minor items should be assessed for their effect on installation, safety and acceptance.

  • Photograph completed access and service points
  • Confirm materials, operators and maintenance support
  • Check FAT actions that affect installation
  • Approve go/no-go for delivery

Comparison table

StageCustomer decisionEvidence
ObjectiveDefine the installed and accepted production state.A numerical target and owner
BaselineSurvey the real route, space and services.Representative production records
ActionSequence enabling work before machinery delivery.A timed plan with responsibilities
ControlUse a readiness gate and signed action list.Approved standard work and review data

Free working templates

Download these files and adapt them to the actual machine, product, site and acceptance plan.

Related buyer guides and tools

Relevant machinery and support routes

Use the guide to define the requirement, then compare the specialist routes below against representative product, packaging and output evidence.

Questions customers also ask

Common questions about this decision

Use these answers to prepare the evidence needed for a useful comparison.

What should be ready before packaging machinery arrives?
Access, space, foundations or floor, utilities, extraction, network, safe working area, test materials, people and installation approvals should be ready.
Who owns site readiness?
The customer normally owns the site, but responsibilities should be agreed between customer, supplier, integrator and contractors.
How much test product is needed?
Enough for setup, repeated checks, sustained output and all required formats. Confirm quantity with the supplier before dispatch.
Should services be live before delivery?
Services should be completed and tested before commissioning depends on them, subject to safe isolation and site procedures.
What happens if the site is not ready?
Installation may stop, engineers may need to return, production dates may move and additional cost may arise. Use a formal readiness gate.
Ask a question
Need a direct answer?

Ask a production question

Tell us what you are producing, the pack you use and the problem you can see. The secure form will route your question to the right production specialist.