Free production calculator

Production downtime cost calculator

Estimate monthly and annual packaging line downtime cost from stop duration, frequency, lost contribution, labour and scrap.

No sign-up is required. Values are calculated in the browser and are not submitted.

Production line relating to production downtime cost calculator

What this calculator does

This calculator estimates the cost of recurring downtime by combining lost contribution during stopped time, labour paid during the stop and scrap or recovery cost per event. Use it to prioritise reliability work, not to overstate revenue that could not have been sold.

Enter your figures and select calculate.
Planning estimate: Monthly stopped hours = stop minutes × events per month ÷ 60. Monthly cost = stopped hours × (lost contribution per hour + affected labour per hour) + scrap/recovery cost per event × events.

Define one repeatable failure mode

Calculate one fault, jam or stop category at a time so the result can support a specific corrective action.

  • Use average or median stop duration
  • Count events from a defined period
  • Separate planned and unplanned stops

Value only real consequences

Lost contribution applies where output is constrained and demand exists. Labour and scrap may still apply even when production can be recovered later.

  • Use contribution rather than selling price
  • Include affected labour only
  • Record overtime or recovery separately

Compare cost with corrective action

Use the annual estimate to justify root-cause work, spares, planned replacement, training or redesign. Verify the benefit after action.

  • Record baseline frequency and duration
  • Set a target reduction
  • Track recurrence after repair

Related calculators and guides

Questions customers also ask

Questions about the calculation

Use the result as a planning estimate, then validate the assumptions with production data.

Should lost sales be included?
Only when the downtime prevents saleable output that cannot be recovered. Otherwise use overtime, delay or recovery cost.
How should labour be valued?
Use the loaded hourly cost of people who are genuinely idle or diverted during the event.
Can scrap be included?
Yes. Include product, packaging, disposal and rework caused by each event.
Should micro-stops be calculated?
Yes when their combined duration or speed loss is significant, but capture them accurately and avoid double-counting OEE losses.
How do I use the result?
Rank recurring losses, compare the cost of corrective action and measure the post-action reduction.